×
Status, Operational. Construction began, 1989. Opening date, 2009. Construction cost, US$720 million. Owner(s), Government of Russia (66.39%) Government of ...
Mar 21, 2024 · Status, Commissioning year, Nameplate capacity, Turbines, Technology type, Owner. Operating, 2008, 670 MW, 4 x 167.5 MW ...
People also ask
Oct 19, 2023 · The operating license expired on May 15. It means that from May 15 to October 6, the power plant operated without license.
Jul 31, 2023 · The second largest hydroelectric power plant operating in Tajikistan – Sangtuda-1 HPP -- may suspend its operations due to the fact that ...
Nov 5, 2023 · The yearly inspection to see if the hydroelectric power station is ready for the winter evaluates whether the company can operate without ...
The Sangtuda HPP-1, located on the Vakhsh River, 160 kilometres south of Dushanbe in Tajikstan, has the ability, when at full output, to supply 12% of the ...
Jan 31, 2024 · Sangtuda is an 890MW hydro power project. It is located on Vakhsh river/basin in Khatlon, Tajikistan. According to GlobalData, who tracks ...
Missing: 1 | Show results with:1
An agreement with Russia allowed to restart the construction, with four units entering service in 2008–2009. The plant was officially commissioned on 31 July ...
Sep 10, 2019 · A new capacity of more than 1,900 megawatts of have been put into operation due to the construction of Sangtuda-1 and Sangtuda-2 hydroelectric ...
Sangtuda 1 Hydroelectric Power Plant, Viloyati Khatlon, Tajikistan ; 38° 2' 42" N · 69° 3' 22" E · 38.045,69.05614 · Csa : Hot-summer Mediterranean climate.